Seite 49Alterations reserved Stand 05/2008
Operating manual T700/T800.1 - en
Continuation
Regulate the quantity of
air blast through valves 7
for the operator side and 8
for the drive side.
Approximately 10 - 15 sheets
on top of pile should be areated.
Use smoothers 9 and 10
as well as spring steel tape 11
for safe sheet conveyance
to the alignment table.
Continuation