26 - 4
26.2 Preparatory Procedures for Monitoring
26.2 Preparatory Procedures for Monitoring
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Connect the GOT to the PLC.
Refer to each chapter.
Install the OS onto the GOT.
Section 26.2.1
Installing OS onto GOT
Make sure that the OS is installed on the GOT.
Section 26.2.2
Checking OS installation on GOT
Set the communication interface. (Communication
settings)
Section 26.2.3
Setting communication interface
(Communication settings)
Download the project data.
Section 26.2.4
Downloading project data
Attach the communication unit and connect the cable.
Section 26.2.5
Attaching communication unit and
connecting cable
Make sure that the GOT recognizes the connected
equipment.
Section 26.2.6
Verifying GOT recognizes connected
equipment