31 - 6
31.2 Preparatory Procedures for Monitoring
31.2 Preparatory Procedures for Monitoring
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Connect the GOT to the PLC.
Refer to each chapter.
Install the OS onto the GOT.
Section 31.2.1
Installing OS onto GOT
Make sure that the OS is installed on the GOT.
Section 31.2.2
Checking OS installation on GOT
Set the communication interface. (Communication
settings)
Section 31.2.3
Setting communication interface
(Communication settings)
Download the project data.
Section 31.2.4
Downloading project data
Attach the communication unit and connect the cable.
Section 31.2.5
Attacing communication unit and
connecting cable
Make sure that the GOT recognizes the connected
equipment.
Section 31.2.6
Verifying GOT recognizes connected
equipment
Make sure that monitoring is performed normally.
Section 31.2.7
Checking for normal monitoring