13 - 1
13
9
CONNECTION TO 
OMRON PLC
10
CONNECTION TO 
KEYENCE PLC
11
CONNECTION TO 
SHARP PLC
12
CONNECTION TO 
TOSHIBA PLC
13
CONNECTION TO 
HIATACHI PLC
14
CONNECTION TO 
MATSUSHITA PLC 
15
CONNECTION TO 
YASKAWA PLC 
16
CONNECTION TO 
YOKOGAWA PLC
CONNECTION TO 
HITACHI PLC
13.1 System Configuration  . . . . . . . . . page 13-2
This section describes equipment and cables needed when 
connecting a GOT to a HITACHI PLC.
Select a system suitable for your application.
13.2 Connection Cable . . . . . . . . . . . . page 13-6
This section describes the specifications of the cables 
needed when connecting a GOT to a HITACHI PLC.
Check the specifications of the connection cables.
13.3 Preparatory Procedures for Monitoring . . . .
 . . . . . . . . . . . . . . . . . . . . . . . . . page 13-11
This section provides the procedures to be followed before 
performing monitoring in connection to a HITACHI PLC.
The procedures are written on the step-by-step basis so 
that even a novice GOT user can follow them to start 
communications.
13.4 PLC Side Setting . . . . . . . . . . . . page 13-26
The PLC side settings for GOT connection are explained.
When checking the PLC side settings, refer to this section.
13.5 List of Functions Added by Version Upgrade
 . . . . . . . . . . . . . . . . . . . . . . . . . page 13-28
This section describes the functions added by version 
upgrade of GT Designer2 or OS.