11-1
This chapter describes common tasks that need to be performed following
installation and programming of the 4010 FACP.
An operator logged into the system at Level 1 can perform all tasks described in
this chapter.
This chapter discusses the following topics:
Topic See Page #
Handling Abnormal Conditions 11-2
Viewing and Clearing Historical Logs 11-5
Viewing and Controlling Points 11-7
Editing Custom Labels 11-10
User Control Functions 11-12
Setting the Time and Date 11-14
Chapter 11
Operation
Overview
In this Chapter
Operation
Technical Manuals Online! - http://www.tech-man.com