Chapter 5 — Operating the Library Controlling the Library Power
December 2019 User GuideSpectra T200, T380, and T680 Libraries
156
CONTROLLING THE LIBRARY POWER
The library power is controlled using the operator panel power button or
the BlueScale Soft Power feature.
Power On the Library
Before powering on the library, make sure that one or both of the library’s
power cables are plugged into AC outlets and that the main AC switches
are set to the on (up) position.
Use the Front Panel Power Button
1. Press and hold the front panel power button until the button’s LED
illuminates and the LCD operator panel turns on.
Important
For redundant AC power configurations, connect the primary and secondary input
for each frame to a separate branch circuit, which allows for failover in the event of
a power failure in one of the circuits (see Power Specifications on page 532 for
additional requirements).
Figure 83 Connect the AC inputs and set switches to the on
position (2N redundant power configuration shown).
Figure 84 Press and hold the front panel power button.
AC power
switch and input
AC power
switch and input
Power button