138 TimeHub 5500 User’s Guide 097-55501-01 Revision M – January 2009
Chapter 4 Testing and Configuring the TimeHub
Overview
Overview
This chapter describes how to install cards into the front panel and configure the
TimeHub 5500. Perform these tasks after you install the shelf and make power,
input, alarm, and communications connections described in Chapter 3, Installing the
TimeHub 5500. If you encounter any difficulties during the installation process,
contact Symmetricom Global Services. See Contacting Symmetricom Global
Services, on page 264 for telephone numbers.
Installing Cards into the Front Panel
The procedures in this section describe how to install the cards into the front panel
of the TimeHub 5500 shelf. See also Installing Modules into the Rear Panel, on
page 109. Refer to Figure 4-1 for the location of the fuse holders and slots for the
cards. Turn on power to the shelf as described in Testing Power Connections, on
page 106.
Figure 4-1. Front Panel of the TimeHub 5500 Shelf
Management
Card
Clock
Cards
Output Driver
Cards
B Fuse and LED A Fuse and LED