097-55501-01 Revision M – January 2009 TimeHub 5500 User’s Guide 17
How to Use This Guide
Structure of This Guide
Structure of This Guide
This guide contains the following sections and appendixes:
Chapter, Title Description
Chapter 1, Description Provides an overview of the product, describes the major
hardware and software features, and lists the system
specifications.
Chapter 2, Engineering Ordering
Information
Describes the modules and cards available with the TimeHub
5500 and provides the part numbers for the parts and accessories.
Chapter 3, Installing the TimeHub
5500
Contains procedures for unpacking and installing the product, and
for powering up the unit.
Chapter 4, Testing and
Configuring the TimeHub
Provides checklist-based commissioning tests that should be
performed after completing turn-up and software configuration to
ensure the system is ready for normal operation.
Describes
the ICS and TL1 commands required to provision the
TimeHub 5500 after installing the unit.
Chapter 5, Maintaining the
TimeHub 5500
Contains preventive and corrective maintenance, and
troubleshooting procedures for the product.
Chapter 6, Specifications
Lists the specifications for the TimeHub 5500.
Appendix A, Maintenance of
Prior Master and Expansion
Shelves
Provides ground and power maintenance information for prior
master and expansion shelves.