EasyManua.ls Logo

Toro Groundsmaster 5910 Series - Page 514

Toro Groundsmaster 5910 Series
559 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation(Figure354)
1.Positionblowerfantoheatercore/ACevaporatorassemblyandsecurewith
six(6)screws.
2.Carefullylowerheatercore/ACevaporatorassemblywithattachedblower
fanintomixingbox.
3.Connectwireharnessconnectorstofreezeswitchandblowerfanassembly
(Figure355).
4.Securemixingboxcover:
A.Positionmixingboxcovertomixingbox.Makesurethatwireharness
isroutedthroughrecessinsideofmixingbox.
B.Withtherivetpininaraisedposition,insertrivetsthroughcoverandinto
holeinmixingbox.Presspinintorivettosecurerivetinplace.
5.Usinglabelsplacedduringdisassembly,connectbothheaterhosestotubes
onheatercoreandsecurewithhoseclamps.
6.Removecapsthatwereplacedonevaporatorcoretubesandexpansion
valveportsduringtheremovalprocess.Positionexpansionvalvewith
attachedhosestotheevaporatorcoretubes.Properlysecureevaporator
coreswivelttingstofrontportsofexpansionvalve.Torquettingsfrom21
to27N·m(15to20ft−lb).
7.Makesurethatallmachineairconditioningcomponentsareinstalledand
secure.
8.Haveacertiedairconditioningservicetechnicianevacuatetheair
conditioningsystemcompletely,properlyrechargethesystemwithR134a
refrigerantandthenleaktestthesystem.A/Csystemcapacityis3.43lb
ofR134arefrigerant.
9.Operatetheheatersystemtomakesurethatnocoolantleaksinheadliner
exist.
10.Secureroofpaneltotopofcab(seeRoofAssembly(page9–9)).
OperatorCab:ServiceandRepairs
Page9–28
Groundsmaster
®
5900&5910
16227SLRevB

Table of Contents

Other manuals for Toro Groundsmaster 5910 Series

Related product manuals