Fields in the CC Activation menu.
Field Description
Continuity Check (CC)
End-to-End
Select whether you activate the OAM-CC test for the connection
between the endpoints of the VCC or VPC.
Possible values:
 (default value): OAM CC requests are responded
to after CC negotiation (CC activation negotiation).
3%: OAM CC requests are sent after CC negotiation (CC
activation negotiation).
:: OAM CC requests are sent and answered after CC ne-
gotiation (CC activation negotiation).
) #: Depending on the setting in the Direction
field, OAM CC requests are either sent and/or responded to.
There is no CC negotiation.
: The function is disabled.
Also select whether the test cells of the OAM CC are to be sent
or received.
Possible values:
: (default value): CC data is both received and gener-
ated.
9: CC data is received.
%: CC data is generated.
Continuity Check (CC)
Segment
Select whether you want to activate the OAM-CC test for the
segment connection (segment = connection of the local end-
point to the next connection point) of the VCC or VPC.
Possible values:
 (default value): OAM CC requests are responded
to after CC negotiation (CC activation negotiation).
3%: OAM CC requests are sent after CC negotiation (CC
activation negotiation).
:: OAM CC requests are sent and answered after CC ne-
gotiation (CC activation negotiation).
) #: Depending on the setting in the Direction
field, OAM CC requests are either sent and/or responded to.