SECTION 31 - IMPLEMENT POWER TAKE-OFF (PTO) - CHAPTER 1
31-14
5. Slide the guard over the PTO shaft, with the
tractor image toward the slide lock.
86065254
33
6. Align the grease fitting, 1, with the square notch
cut into the guard. Secure the cone guard and
guard to the support rings with the screws.
86065240
1
34
7. Stand the unit up on end, on the floor, or
workbench.
86065259
35