183
Installation
Step5: Carry out wiring work as required.
Knock out the holes on
the sheet metal as
required and put on the
rubber rings provided by
the factory before wiring
connection.
All wires shall be firmly fixed with
fixing clamps, and ensure that each
wire is reliably grounded.
All wires shall be firmly fixed with
fixing clamps, and ensure that each
wire is reliably grounded.
Only the structural layout
is displayed, the actual
assembly of the unit
shall prevail.