EasyManuals Logo

Keysight N9038A Service Guide

Keysight N9038A
745 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #624 background imageLoading...
Page #624 background image
643
Keysight Technologies X-Series Signal Analyzers
N9038A MXE Signal Analyzer
Service Guide
19 Post-Repair Procedures
What You Will Find in This Chapter
This chapter provides information that will enable you to return an instrument
to full operation following the replacement of any instrument assembly. This
information includes a table that shows which adjustments and/or
performance tests must be executed after replacing an assembly.
Before Starting
There are three things you should do before starting any of the procedures
listed or described in this chapter:
— Familiarize yourself with the safety symbols, and read the general safety
considerations and the safety note definitions in the front of this guide,
before you begin the procedures in this chapter.
— Check that the instrument has been turned on and allowed to warm up.
— Ensure that the instrument is operating within a temperature range of 20 °C
to 30 °C.

Table of Contents

Other manuals for Keysight N9038A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Keysight N9038A and is the answer not in the manual?

Keysight N9038A Specifications

General IconGeneral
BrandKeysight
ModelN9038A
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals