EasyManua.ls Logo

Keysight N9038A - Page 625

Keysight N9038A
745 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
644 Keysight N9038A MXE Service Guide
Post-Repair Procedures
Post-Repair Procedures
Post-Repair Procedures
The following table lists the adjustments and performance verification tests
needed after an assembly replacement.
After an assembly is replaced, find the assembly that has been replaced in the
left-hand column, and then perform the recommended adjustment and/or
performance verification test. Making the recommended adjustments and/or
performance verification tests doesn’t guarantee all published specifications
are being met. Only a full instrument calibration will do this.
The following procedures are also included in the “Calibration Data Backup
and Restore” on page 647.
“Calibration Data Backup and Restore” on page 647
“BIOS Settings Verification” on page 651
“Operating System Initialization” on page 652
“FPGA Synchronization” on page 655
“Programming Model and Serial Numbers” on page 657
Refer to the instrument user’s guide for information on instrument warm-up before performing
any of the procedures listed in this chapter.

Table of Contents

Other manuals for Keysight N9038A

Related product manuals