EasyManua.ls Logo

Krone Big Pack 890 - Initiate the Tying Process Manually

Krone Big Pack 890
352 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
213
Pos: 34.34 /BA/Bedienung / Großpackenpresse/ Bindevorgang von Hand aus lösen @ 20\mod_12387454 96511_78.doc @ 224967
11.11.3 Initiate the tying process manually
During check of the needle setting (check the height of the needles of the knotter) the tying
process must be initiated manually with the machine at a standstill.
Respectively on medium design only:
Before ejection of the last bale on a medium design machine, it must be tied by releasing the
tying process manually with the machine at a standstill.
Fig. 142
To do this:
Swivel the safety lever (2) down
With mechanical triggering:
Move the lever (1) up to trigger the tying process
With electrical triggering (optional):
Move the lever (3) back to trigger the tying process
Then move the needles upward to the knotter and back manually on the flywheel (in the working
direction) or by turning on the P.T.O. shaft.
Pos: 34.35 /BA/Bedienung / Großpackenpresse/ Bindevorgang von Hand aus lösen Hinweis Einfac hknoter @ 20\mod_1238751 232855_78.doc @ 224991
Note
In the case of the single knotter, make certain that the twines are pulled back after the last tie.
Otherwise the thread may unravel the next time a knot is tied.
Pos: 34.36 /BA/-----Seitenumbruch------ @ 0\mod_1196175311226_ 0.doc @ 4165

Table of Contents

Other manuals for Krone Big Pack 890

Related product manuals