Installation
Check-out and Power-up
MagneMover LITE User Manual 309
Rockwell Automation Publication MMI-UM002F-EN-P - October 2022
Check-out and Power-up
System Check-out
Before the MagneMover LITE transport system is started for the first time, or after servicing
the transport system, it is necessary to check all operating and safety features.
The following startup procedure is used to apply power to the MagneMover LITE transport
system in an orderly manner to make sure that all components are in known states. This proce-
dure is used to prepare the transport system for full operation.
Mechanical Checks
• Verify that all shipping brackets have been removed.
• Make sure that all MagneMover LITE components are properly and securely installed
in the facility.
• Make sure that all hardware is secure.
• If the optional E-stop circuit is being used, make sure that the button is functional.
• Manually move a vehicle (puck) through the entire MM LITE transport system to ver-
ify free vehicle motion (no binding).
• If the precision rail option is being used, make sure that the rails and vehicle bearings
have a thin coating of oil as described in Precision Rail Lubrication on page 132.
Facility Checks
• Make sure that all facilities meet, or exceed, the requirements as described in the Elec-
trical Specifications on page 206 and Site Requirements on page 234.
• Make sure that all system power and communication connections have been com-
pleted.
• Check all cables. Verify that the connectors are fully seated and screws/locks are
secured to make sure of good continuity.
• Verify that all cables are routed so they are shielded from damage and can be easily
accessed for service and are away from any travel areas.
• Inspect all cables for restricting bend radii, excessive tension, or physical damage.
Pre-operation Checks
• Make sure that there are no obstructions in the travel path of the vehicles (pucks).