EasyManua.ls Logo

Rotax 914 F - 12.2 Maintenance Schedule

Rotax 914 F
274 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ReferenceModification no.
- 5 -
Page
89
Date
2003 03 01
Main
914 F
d03048
12.2) Maintenance Schedule
The following maintenance is planned and necessary for ROTAX
®
914 F:
Comment to
1)
: To be carried out after the first 25 operating hours.
Comment to
2)
: 100 operating hours or after 1 year, whichever comes first.
Comment to
3)
: The actual TBO of engines at the time of delivery has to be taken
out of SB-914-027, latest issue.
Extension or exceeding of the TBO by 5 % or 6 months is allowed.
Comment to
4)
: Using leaded fuel the oil change has to be carried out every 50 h.
See SI 19-1997 latest edition.
Comment to
5)
: Gear box of engine configuration 3 (with slipper clutch) and using
leaded fuel in access of 30% of operation.
Pic. 38
05698
Description
25 hrs
1)
every 50 hrs
4)
every 100 hrs
2)
every 200 hrs
every 300 hrs
every 600 hrs
every XXXX hrs
3)
every 2 years
every 5 years
XX years
3)
see Chapter
Engine cleaning
X XXXX
12.3.1)
Visual engine check
X XXXX
12.3.2)
Leakage check
X XXXX
12.3.3)
Inspection of engine suspenion
X XXXX
12.3.4)
Check of external engine parts
X XXXX
12.3.5)
Check of waste-gate position
X XXXX
12.3.6)
Check of waste gate cable bowden
XXXX
13.5.4.2)
Check of gearbox
X XXXX
12.3.7)
Oil level check
X XXXX
12.3.8)
Oil change
XXXXXX
12.3.9)
Oil filter renewal
XXXXXX
12.3.10)
Inspection of magnetic screw
X XXX
12.3.11)
Check of cooling system
X XXXX
12.3.13)
Rinsing of cooling system
XX
12.3.13.1)
Renewal of coolant
X
12.3.13.2)
Inspection of air filter
X XXXX
12.3.14)
Check of carburetors
XXX
12.3.15)
Check of cables
X XXXX
12.3.16)
Check of V-belt
X XXXX
12.3.17)
Renewal of spark plugs
XXXX
12.3.18)
Security check of spark plug connectors
XX
12.3.19)
Check of compression
XX
12.3.20)
Inspection of fuel filter, fuselage side
X XXXX
12.3.21)
Conduct engine test run
X XXXX
12.3.22)
Renew rubber parts
X
12.3.23)
Check of overload clutch
X
5)
12.4.2)
Overhaul
XX
12.3.24)
Description
25 hrs
1)
every50hrs
4)
every 100 hrs
2)
every 200 hrs
every 300 hrs
every 600 hrs
every XXXX hrs
3)
every 2 years
every 5 years
XX years
3)
see chapter

Table of Contents

Other manuals for Rotax 914 F

Related product manuals