EasyManuals Logo

Arkray ADAMS A1c User Manual

Arkray ADAMS A1c
288 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #177 background imageLoading...
Page #177 background image
Chapter 4 Maintenance
HA-8190V 4-12
The optional hand-held barcode reader can also be used.
If your entry is accepted, the lot number and expiration date will
be updated.
b Touch .
3 Open the temperature control box cover.
a Wait for the screen shown on the right to appear, and then open
the front cover.
The nozzle mechanical sections will power off.
b Open the temperature control box cover.
Push the handle to the left, then pull it to the front to open the box.
c Lay tissue paper on the bottom of the temperature control box.
The tissue paper blots up any liquids that leak while replacing the
column.
NOTE:
Check that the lot number and expiration date displayed
on the screen match those written on the CERTIFICATE
OF QUALITY.
Keep the CERTIFICATE OF QUALITY in a safe place
until the column is discarded.
REFERENCE:
If the <Lot No.> and <Expiry> fields are not updated and still
display hyphens (---):
Your entry may be incorrect. Carefully check the
CERTIFICATE OF QUALITY carefully and enter the correct
code.
Next
REFERENCE:
The message “W-062 The front or maintenance cover is open.”
appears if the front cover is opened before performing step
1-a. Be sure to perform step 1-a first.
a
b
c

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Arkray ADAMS A1c and is the answer not in the manual?

Arkray ADAMS A1c Specifications

General IconGeneral
BrandArkray
ModelADAMS A1c
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals