EasyManuals Logo

Cisco D9887B User Manual

Cisco D9887B
290 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #26 background imageLoading...
Page #26 background image
Chapter 1 Getting Started
2 78-4043743-01 Rev A
Installation
Cooling
The D9887B receiver is cooled via forced induction through the front of the unit and
exhausted through the vents on either side. The D9887B receiver is equipped with a
temperature controlled status indicator. If the temperature inside the unit exceeds
70° C, the red “Error” LED will illuminate and a description of the error will appear
in the “Error List.”
Rack Information
The D9887B receiver is intended to be mounted in a standard 19" rack. It occupies 1U
of rack space and the connections are all on the rear of the unit.
Rack Installation
To install the D9887B receiver into a rack, use the following steps:
1 Determine the desired position in the rack for the D9887B receiver, making sure
that the air intake on the front of the unit and the exhausts on the sides of the
unit will not be obstructed.
2 Insert the rack mount clips into place over the mounting holes in the rack.
3 Slide the D9887B receiver into position in the rack.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco D9887B and is the answer not in the manual?

Cisco D9887B Specifications

General IconGeneral
BrandCisco
ModelD9887B
CategoryReceiver
LanguageEnglish

Related product manuals