4. Periodical check Field Service Ver. 1.0 Aug. 2005
24
bizhub 200/250/350
Maintenance
6. Remove two Screws [12] and the
Tray 1 Separation Roller installation
plate Assy [13].
7. Remove two C-clips [14] and the
Tray 1 Separation Roller installation
plate [15].
8. Remove the C-clip [16] and the Tray
1 Separation Roller Assy [17].
9. To reinstall, reverse the order of
removal.
10. Select [Tech. Rep. Mode] →
[Counter] → [Special Parts Counter]
→ [Tray 1] and clear the counter.
NOTE
• Install the Tray 1 Separation Roller
Mounting Bracket Assy [18] while
pressing the holder up so that it
coheres to the metal bracket of the
copier.
4040F2C520DA
[12]
[13]
4040F2C521DA
[14]
[14]
[15]
4040F2C522DA
[16]
[17]
4040F2C523DA
[18]