Preliminary steps
â–¶
"Locating the defective server" on page 43
.
â–¶
"Locating the defective component" on page 44.
â–¶
"Shutting down the server" on page 45.
â–¶
"Getting access to the component" on page 48.
Removing the defective 3.5-inch non hot-plug HDD
â–¶
Remove the non hot-plug HDD, see "Removing 3.5-inch non hot-plug
HDDs" on page 143.
Installing the new 3.5-inch non hot-plug HDD
â–¶
Install the non hot-plug HDD, see "Installing 3.5-inch non hot-plug HDDs"
on page 137.
Concluding steps
â–¶
"Reassembling" on page 54.
â–¶
"Connecting the power cord" on page 57.
â–¶
"Switching on the server" on page 60.
â–¶
If the HDD/SSD is configured using a RAID controller with a RAID level
higher than "0", the rebuild will start automatically, see "Performing a RAID
array rebuild" on page 92.
Hard disk drive (HDD) / solid state drive (SSD)
TX1320 M5 Upgrade and Maintenance Manual 149