Preliminary steps
▶
"Locating the defective server" on page 43
.
▶
"Locating the defective component" on page 44.
▶
"Shutting down the server" on page 45.
▶
"Getting access to the component" on page 48.
Removing the defective 3.5-inch non hot-plug HDD
▶
Remove the non hot-plug HDD, see "Removing 3.5-inch non hot-plug
HDDs" on page 143.
Installing the new 3.5-inch non hot-plug HDD
▶
Install the non hot-plug HDD, see "Installing 3.5-inch non hot-plug HDDs"
on page 137.
Concluding steps
▶
"Reassembling" on page 54.
▶
"Connecting the power cord" on page 57.
▶
"Switching on the server" on page 60.
▶
If the HDD/SSD is configured using a RAID controller with a RAID level
higher than "0", the rebuild will start automatically, see "Performing a RAID
array rebuild" on page 92.
Hard disk drive (HDD) / solid state drive (SSD)
TX1320 M5 Upgrade and Maintenance Manual 149