▶
Inform the system administrator that the server will be shut down and put
offline.
▶
T
erminate all applications.
▶
Perform the required procedures described in the preliminary steps of each
upgrade or maintenance task.
▶
Shut down the server.
If the system is running an ACPI-compliant operating system (OS),
pressing the On/Off button will perform a graceful shutdown.
▶
Switch on the ID indicator on the front panel and I/O panel of the server, see
"Locating the defective server" on page
43.
4.6 Disconnecting the power cord
Standard power supply
Figure 2: Removing the power cord from the PSU cable tie
Basic hardware procedures
46 Upgrade and Maintenance Manual TX1320 M5