Concluding steps
▶
If applicable, convert your standard power supply to a redundant power
supply, see
"Converting a standard power supply to a redundant power
supply" on page 164.
▶
Install all removed HDD modules, see "Installing 2.5-inch HDD/SSD
modules" on page 214.
For detailed information on HDD mounting order, see "3.5-inch HDD
configurations" on page 181.
▶
"Reassembling" on page 66.
▶
"Connecting the power cord" on page
79.
▶
"Switching on the server" on page 81.
▶
Update the system information of your server using the Chassis ID Prom
Tool, see "Using the Chassis ID Prom Tool" on page 126. Select the
corresponding system name.
▶
"Resuming BitLocker functionality" on page 121.
Hard disk drive (HDD) / solid state disk (SSD)
208 Upgrade and Maintenance Manual TX1330 M4