CHAPTER
1
ABOUT THIS GUIDE
Abstract
This document provides descriptions and procedures for the
Installation, Configuration, Operation, and Troubleshooting of your
controller.
Revision history
Revision Date
Document
ID
Description
1.0 November
2020
51-52-25-
157
Initial release of this document
2.0 December
2020
51-52-25-
157
Added maximum digits for PV and SP display
3.0
March
2021
51-52-25-
157
Implemented Modbus function
4.0
March
2021
51-52-25-
157
Added TPSC, PP and Slidewire
5.0 June 2022 51-52-25-
157
Added firmware upgrade via BLE app and PIE
tool configuration
Special Terms
The following table lists those symbols used in this document to
denote certain conditions.
Symbol Definition
PID Proportion Integration Differentiation
PIE Process Instrument Explorer
PV Process Variable
RTD Resistance Temperature Detector
11