Table 10: Site Preparation Checklist for SRX650 Services Gateway
Installation (continued)
NotesDate
Performed
ByAdditional InformationItem or Task
“SRX650 Services
Gateway Environmental
Specifications” on
page 42
Verify that
environmental
factors such
as
temperature
and humidity
do not exceed
device
tolerances.
Rack Installation
“SRX650 Services
Gateway Rack Size and
Strength Requirements”
on page 47
Verify that
your rack
meets the
minimum
requirements.
“SRX650 Services
Gateway Spacing of
Mounting Bracket and
Flange Holes” on page 47
Plan rack
location,
including
required space
clearances.
“Connecting the SRX650
Services Gateway to the
Building Structure” on
page 69
Secure the
rack to the
floor and
building
structure.
Cabinet Installation
“SRX650 Services
Gateway Cabinet Size
and Clearance
Requirements” on
page 51
Verify that
your cabinet
meets the
minimum
requirements.
“SRX650 Services
Gateway Cabinet Airflow
Requirements” on
page 52
Plan the
cabinet
location,
including
required space
clearances.
Cables
“Interface Cabling and
Wiring Specifications for
the SRX650 Services
Gateway” on page 59
Acquirecables
and
connectors.
Copyright © 2018, Juniper Networks, Inc.40
SRX650 Services Gateway Hardware Guide