• Clearance Requirementsfor Airflow and Hardware Maintenance of the SRX650 Services
Gateway on page 48
SRX650 Services Gateway Cabinet Airflow Requirements
When you mount the SRX650 Services Gateway in a cabinet, you must ensure that
ventilation through the cabinet is sufficient to prevent overheating. Consider the following
when planning for chassis cooling:
•
Ensure that the cool air supply you provide through the cabinet can adequately dissipate
the thermal output of the services gateway.
•
Install the services gateway as close as possible to the front of the cabinet so that the
cable management system clears the inside of the front door. Installing the chassis
close to the front of the cabinet maximizes the clearance in the rear of the cabinet for
critical airflow.
•
Route and dress all cables to minimize the blockage of airflow to and from the chassis.
Related
Documentation
• SRX650 Services Gateway Chassis on page 17
• SRX650 Services Gateway Cabinet Size and Clearance Requirements on page 51
• SRX650 Services Gateway Spacing of Mounting Bracket and Flange Holes on page 47
• SRX650 Services Gateway Rack Size and Strength Requirements on page 47
• Clearance Requirementsfor Airflow and Hardware Maintenance of the SRX650 Services
Gateway on page 48
Copyright © 2018, Juniper Networks, Inc.52
SRX650 Services Gateway Hardware Guide