Table 10: Site Preparation Checklist for SRX650 Services Gateway
Installation (continued)
NotesDate
Performed
ByAdditional InformationItem or Task
Review the
maximum
distance
allowed for
each cable.
Choose the
length of
cable based
on the
distance
between the
hardware
components
being
connected.
Plan the cable
routing and
management.
Related
Documentation
SRX650 Services Gateway Chassis on page 17•
• Installation Overview for the SRX650 Services Gateway on page 63
• General Site Installation Guidelines for the SRX650 Services Gateway on page 41
General Site Installation Guidelines for the SRX650 Services Gateway
The following precautions help you plan an acceptable operating environment for your
SRX650 Services Gateway and avoid environmentally caused equipment failures:
•
For the cooling system to function properly, the airflow around the chassis must be
unrestricted. Allow sufficient clearance between the front and back of the chassis and
adjacent equipment. Ensure that there is adequate circulation in the installation location.
•
Follow the ESD procedures to avoid damaging equipment. Static discharge can cause
components to fail completely or intermittently over time. For more information, see
“Preventing Electrostatic Discharge Damage to the SRX650 Services Gateway” on
page 168.
•
Ensure that the blank panels are installed into empty slots to prevent any interruption
or reduction in the flow of air across internal components.
NOTE: Install the servicesgatewayonlyin restricted areas,such as dedicated
equipment rooms and equipment closets, in accordancewith Articles110–16,
110–17, and 110–18 of the National Electrical Code, ANSI/NFPA 70.
41Copyright © 2018, Juniper Networks, Inc.
Chapter 7: Planning and Preparing the Site