9.6-4 NORMAL PROCEDURES
NORMAL PROCEDURES CHECKLIST
Preight Inspection
LEFT SIDE
1. Fuselage Floor Skin Drain Holes .................................................CHECK
(Check for any sign of leaks in the aircraft sidewall or sub-oor.)
2. Ensure cargo is secure and within the weight limits of each bay.
3. Ensure three ECC doors are closed and latched.
AFT SECTION
Ensure strakes and ventrals are secure and in good condition.
RIGHT SIDE
Open Fuel Drain Manifold Access Door and sump fuel out of exible plastic
tube into a suitable container by pressing each of the fuel drain manifold
buttons.
RIGHT FRONT
1. Sump Firewall Mounted Fuel Filter by opening access door and pushing
up onto drain sleeve. Drain fuel into a suitable container.
2. Remove engine inlet bypass outlet plugs if installed.
LEFT FRONT
Sump EPA can drain located on bottom of pod fairing.
AMPLIFIED NORMAL PROCEDURES
Preight Inspection
The seventeen (17) fuselage oor skin drain holes should be checked for
any sign of blockage or leakage. Care should be taken to open the cargo
compartment doors and conrm all sidewall and sub-oor drain holes are
clean.