Operation 8
Completing the baling process, starting tying cycle and ejecting round bales 8.4
Comprima V 180
Original Operating Instructions 150001053_00_en 69
KRONE component Order number
Driver guide rails 20062579*
Fixing material 00904025*
ü The tailgate is opened and secured, refer to page73.
ü The machine is shut down and safeguarded, refer to page25.
Mount the 6driver guide rails(1) on the starter roller(2).
8.3.3 Mounting additional deflector sheets in the tailgate
RPG000-060
If the finished round bales do not fall out of the bale chamber, 2deflector sheets(1) can be
mounted on the right and left sides of the machine tailgate.
The deflector sheets(1) can be ordered by quoting the following order number:
KRONE component Order number
Deflector sheets 2x 00275479*
ü The tailgate is opened and secured, refer to page73.
ü The machine is shut down and safeguarded, refer to page25.
Mount the deflector sheets(1) on the insides of the bale chamber by screwing the screw
connections(2) into the available boreholes.
If the finished round bales are still not falling out of the bale chamber following installation of the
deflector sheets(1):
Remove the slide sheets(3) from the right and left sides of the machine housing.
8.4 Completing the baling process, starting tying cycle and ejecting
round bales
Open the tailgate and eject the round bale. Make sure that the tailgate is always fully open
to ensure the pressure for the bale formation conveyor tension is established.
Close the tailgate at idling speed.
Start the next baling process.
8.5 Moving bale formation conveyors into the working / parking position
Before starting baling work, the bale formation conveyors must be moved into the working
position and hydraulically clamped. After finishing baling work, the bale formation conveyors
must be moved for protection back into the parking position and declamped.