4 Commissioning
4.1 Before inial s
witch-on
Prevent injury to persons and damage to property. Check the following before switching on
the mains voltage:
Is the wiring complete and correct?
Are there no short circuits and earth faults?
Is the motor circuit conguraon (star/delta) adapted to the output voltage of the inverter?
Is the motor connected in-phase (direcon of rotaon)?
Does the "emergency stop" funcon of the
enre plant operate correctly?
Commissioning
Be
fore inial swit
ch-on
13