Driving modes
6.4 Installing/removing the outrigger beams
Operating manual 3 302 736 en 6 - 19
GMK4090
xx.xx.xxxx
6. Screw in the spacers; Ã p. 6 - 26.
7. If necessary, put supporting pads into position;
à p. 6 - 22.
8. Mount all necessary outrigger beams in the same way in accordance
with this checklist.
9. If the truck crane is at the site:
Extend the outrigger beams to the necessary outrigger span, secure
them and stabilize the truck crane.
10. If the truck crane still has to be driven to the site:
Fully retract and secure the outrigger beams.
à Extending/retracting outrigger beams, p. 12 - 49.