EasyManua.ls Logo

Manitowoc GROVE GMK4090 - Rigging Work; Rigging Work Checklists for Crane Operation with the Main Boom; CHECKLIST: Rigging

Manitowoc GROVE GMK4090
994 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating manual 3 302 736 en 12 - 1
GMK4090
xx.xx.xxxx
12 Rigging work
If the truck crane on the site has already been rigged, proceed according to
the
CHECKLIST: Checks before operating the crane, p. 11 - 1.
12.1 Rigging work checklists for crane operation with the
main boom
H
This checklist is not a complete operating manual. There are accompanying
operating instructions which are indicated by cross-references.
Observe the warnings and safety instructions there.
12.1.1 CHECKLIST: Rigging
1. Choose a suitable site; à Choice of a suitable positioning site, p. 12 - 11.
2. Check that the parking brake is engaged – if necessary, engage the park-
ing brake.
3. If the main boom is resting on a dolly:
Switch off the boom floating position;
à p. 12 - 19
Switch off the slewing gear freewheel;
à p. 12 - 20
If necessary, switch off boom pre-tensioning;
à p. 12 - 21.
H
The following points only apply to rigging in Free on wheels working position.
Continue the checklist at point 8. when rigging the truck crane on outrig-
gers.
s

Table of Contents

Other manuals for Manitowoc GROVE GMK4090

Related product manuals