EasyManuals Logo

Manitowoc GROVE GMK4090 User Manual

Manitowoc GROVE GMK4090
994 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #707 background imageLoading...
Page #707 background image
Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating manual 3 302 736 en 12 - 3
GMK4090
xx.xx.xxxx
H
The following points only apply when rigging the truck crane on outriggers.
To continue rigging in the
Free on wheels working position, continue the
checklist at point 12.
8. Check whether the ground will support the maximum occurring outrig-
ger pressures;
à Determining the required load-bearing area, p. 12 - 11.
9. Deactivate (Lock) the suspension – symbol red (suspension off);
à p. 5 - 17.
10. Support the truck crane with the outrigger span required for the job
according to the
Lifting capacity table and raise until none of the wheels
is touching the ground;
à Outrigger operation, p. 12 - 41.
11. Align the truck crane horizontally;
à p. 12 - 60.
s

Table of Contents

Other manuals for Manitowoc GROVE GMK4090

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK4090 and is the answer not in the manual?

Manitowoc GROVE GMK4090 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK4090
CategoryConstruction Equipment
LanguageEnglish

Related product manuals