EasyManua.ls Logo

Manitowoc GROVE GMK4090 - Levelling the Truck Crane on Outriggers Horizontally

Manitowoc GROVE GMK4090
994 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging work
12.8 Outrigger operation
12 - 60 3 302 736 en Operating manual
GMK4090
xx.xx.xxxx
12.8.9 Levelling the truck crane on outriggers horizontally
You must level the truck crane before crane operation horizontally and pos-
sibly correct its horizontal alignment during crane operation.
Inclination
indicators
After switching on the ignition, various inclination indicators display the
current alignment.
Switching between measuring ranges
You can change the measuring range between
1° and 5°.
Press the button (2) once.
The current measuring range (1) is dis-
played.
The measuring range is automatically
switched in the
Outrigger menu and the Moni-
toring
menu.
Read the display
Only the lamp (1) at the centre is on if the truck
crane is level.
The other lamps show the sides of the truck
crane which are higher.
RCL / CCS display
The assignment to the carrier is given by the
directional indicator (1).
In this example, the carrier would be stand-
ing higher to the rear on the right hand side.
A In the
Monitoring menu
B In the
Outrigger menu
C On the
Outrigger control units

Table of Contents

Other manuals for Manitowoc GROVE GMK4090

Related product manuals