EasyManua.ls Logo

Manitowoc GROVE GMK4090 - Page 712

Manitowoc GROVE GMK4090
994 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging work
12.1 Rigging work checklists for crane operation with the main boom
12 - 8 3 302 736 en Operating manual
GMK4090
xx.xx.xxxx
6. For on-road driving with a dolly:
Set down the superstructure on a dolly with the RCL adjusted accord-
ingly and switch on the boom floating position;
à p. 6 - 13,
Switch on slewing gear freewheel;
à p. 6 - 12
Switch on boom pre-tensioning if necessary;
à p. 6 - 14,
Switching off the houselock;
à p. 11 - 16
7. Turn off the engine for crane operation;
à p. 10 - 11.
8. If necessary, remove the anemometer and air traffic control light;
à Anemometer and air traffic control light, p. 12 - 147.
9. If necessary, remove the camera from the main boom;
à Cameras for crane operation, p. 12 - 154.
10. Fold in all mirrors for crane operation;
à Folding the mirrors in and out,
and adjusting them
, p. 12 - 153.
Slew the slewable spotlights to point downwards;
à p. 11 - 128.

Table of Contents

Other manuals for Manitowoc GROVE GMK4090

Related product manuals