Rigging work
12.1 Rigging work checklists for crane operation with the main boom
12 - 8 3 302 736 en Operating manual
GMK4090
xx.xx.xxxx
6. For on-road driving with a dolly:
– Set down the superstructure on a dolly with the RCL adjusted accord-
ingly and switch on the boom floating position;
à p. 6 - 13,
– Switch on slewing gear freewheel;
à p. 6 - 12
– Switch on boom pre-tensioning if necessary;
à p. 6 - 14,
– Switching off the houselock;
à p. 11 - 16
7. Turn off the engine for crane operation;
à p. 10 - 11.
8. If necessary, remove the anemometer and air traffic control light;
à Anemometer and air traffic control light, p. 12 - 147.
9. If necessary, remove the camera from the main boom;
à Cameras for crane operation, p. 12 - 154.
10. Fold in all mirrors for crane operation;
à Folding the mirrors in and out,
and adjusting them
, p. 12 - 153.
Slew the slewable spotlights to point downwards;
à p. 11 - 128.