EasyManua.ls Logo

Manitowoc GROVE GMK4090 - Page 849

Manitowoc GROVE GMK4090
994 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging work
12.10 Rigging work on the main boom
Operating manual 3 302 736 en 12 - 145
GMK4090
xx.xx.xxxx
Removing the right lifting limit switch
Pull out the plug and close the socket with
the protective cap (1).
Remove the lifting limit switch (4) from the
bracket (2).
Attach the retaining pin (3) to the lifting limit
switch.

Table of Contents

Other manuals for Manitowoc GROVE GMK4090

Related product manuals