EasyManua.ls Logo

Manitowoc GROVE GMK4090 - Page 949

Manitowoc GROVE GMK4090
994 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Malfunctions during crane operation
14.6 Hydraulic emergency operation with the hand pump
Operating manual 3 302 736 en 14 - 53
GMK4090
xx.xx.xxxx
For lowering You must additionally switch a valve to continuous operation for lowering.
Switching on continuous operation
Unscrew the cap (2) from valve Y1104 Low-
ering
(1).
Remove the plug (4).
Screw the cap with pin (3) on to the valve –
continuous operation is now switched on.
Switching off continuous operation
Unscrew the cap (2) from the valve (1).
Screw the cap on so that the pin (3) can be
seen.
Insert the plug (4).
S
Danger due to falling loads
Switch off continuous operation immediately after emergency activation.
Check that the pin can be seen on the cap.
Thus you prevent loads falling down immediately after lifting in subse-
quent crane operation.

Table of Contents

Other manuals for Manitowoc GROVE GMK4090

Related product manuals