Malfunctions during crane operation
14.7 Hydraulic emergency operation as per BGR 159
Operating manual 3 302 736 en 14 - 61
GMK4090
xx.xx.xxxx
Removing After the emergency operation, you must disconnect the hoses and the
transformer.
On the superstructure
• Remove the hoses (2) from the
connections (1).
• Close off the hoses and connections with the
caps.
On the carrier
• Remove the hoses (2) from the
connections (1).
• Close off the hoses and connections with the
caps.
• Remove the transformer (3).