EasyManua.ls Logo

Manitowoc GROVE GMK5150L

Manitowoc GROVE GMK5150L
1040 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating elements for crane operation
9.1 Overview of the operating elements
Operating manual 9 - 3
GMK5150L
s
1 Camera on main boom
1)
Camera on the hoists
Camera on the driver's cab
1)
à p. 12 - 152
à p. 12 - 155
à p. 12 - 155
2 Lifting limit switch – function
Installing/removing the lifting limit switch
à p. 11 - 82
à p. 12 - 139
3 Anemometer and air traffic control light
1)
à p. 12 - 145
4 Using the slewable spotlights
1)
à p. 11 - 130
5 Installing/removing the hose drum
1), 3)
6 Socket for hand-held control à p. 9 - 83
7 Rigging the main boom
1)
à p. 6 - 17
8 RCL override – Version A
4)
Key-operated switch for overriding the RCL in an
emergency
RCL override – Version B
4)
No function
à p. 9 - 143
à p. 9 - 144
9 Spotlights
1)
à p. 9 - 8
10
RCL status display à p. 11 - 63
11 Lowering limit switch
à p. 11 - 84
12 Hydraulic emergency operation with the hand
pump
Hydraulic emergency operation acc. to BGR 159
1)
à p. 14 - 51
à p. 14 - 59
13 Counterweight, removed
à p. 12 - 71
14 Outriggers
operation
Lighting
Installing/removing the outrigger beams
à p. 12 - 41
à p. 12 - 45
à p. 6 - 51
15 Shut-off valves at the hydraulic tank
à p. 10 - 4
16 Step at the crane cab Switching on/off
à p. 12 - 157
17 Crane cab
à p. 9 - 6
1)
Additional equipment
2)
à Maintenance manual
3)
à Lattice extension operating manual
4)
Version A or version B active depending on RCL programming

Table of Contents

Related product manuals