25 - 4
25.2 Preparatory Procedures for Monitoring
25.2 Preparatory Procedures for Monitoring
The following shows the procedures to be taken before monitoring and corresponding reference sections.
On system configuration example
This section describes GOT side settings.
For system configuration examples of bar code reader connection, refer to the
following.
Section 25.4 System Configuration Examples
Connect the GOT to the PLC.
Refer to each chapter.
Install the OS onto the GOT.
Section 25.2.1
Installing OS onto GOT
Make sure that the OS is installed on the GOT.
Section 25.2.2
Checking OS installation on GOT
Set the communication interface. (Communication
settings)
Section 25.2.3
Setting communication interface
(Communication settings)
Download the project data.
Section 25.2.4
Downloading project data
Attach the communication unit and connect the cable.
Section 25.2.5
Attaching communication unit and
connecting cable
Make sure that the GOT recognizes the connected
equipment.
Section 25.2.6
Verifying GOT recognizes connected
equipment
Make sure that monitoring is performed normally.
Section 25.2.7
Checking for normal monitoring