8 Operation
Maschinenfabrik Reinhausen GmbH 2020186 3587317/21 ENTAPCON
®
TSL
req
TSL
act
I
C
U
t
t
Pos
t
1
2
3
4
5
6
7
8
9
10
11
12
0 8
0 2 4 6 8 6
1
2
3
Pos>
Pos<
+B%
-B%
Figure128: Example switching sequence of the tap stagger parallel operation method
1 Tap position of the master 2 Total tap position of the sys-
tem
3 Tap position of the follower B% Bandwidth
I
C
Circulating reactive current Pos Tap position
TSL
req
Desired tap stagger level Pos>/
Pos<
Maximum/minimum tap posi-
tion
TSL
act
Current tap stagger level U Measured voltage