12713020-002-2 Revision D – April 2004 SSU-2000 User’s Guide 103
Chapter 4 Commissioning
The commissioning tests for the SSU-2000 are checklist-based operational tests
that field engineers perform at the installation site after completion of installation,
system turn-up, and provisioning to verify that the system is correctly installed,
configured and operating properly. At this point, the system is ready to be placed in
service.
Record the results on the data sheet provided in Commissioning Test Data Sheet,
on page 110.
In This Chapter
Readiness to Test Checklist
SSU-2000 Commands
Equipment Requirements
Commissioning Tests
Commissioning Test Data Sheet

Table of Contents

Other manuals for Symmetricom SSU-2000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Symmetricom SSU-2000 and is the answer not in the manual?

Symmetricom SSU-2000 Specifications

General IconGeneral
BrandSymmetricom
ModelSSU-2000
CategoryPower Supply
LanguageEnglish

Related product manuals