Gen II User Manual
11-7 – Fan Blade Mapper Chapter 11 Revision 3.00, Apr 2020
11.1.6.2. Once the blade placement is complete, a vibration survey should be completed to
ensure the balance is acceptable. If the balance is not acceptable, perform a
Transient Balance in accordance with Chapter 9 or a Fan/Turbine Balance in
accordance with Chapter 10.
11.2. – Resume Job
The features in this section are common among all jobs. Because of this, they are contained in
Chapter 3, “Using the Gen II Analyzer”.
11.3. – Manage Jobs
The features in this section are common among all jobs. Because of this, they are contained in
Chapter 3, “Using the Gen II Analyzer”.