EasyManuals Logo

Arkray ADAMS A1c User Manual

Arkray ADAMS A1c
288 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #214 background imageLoading...
Page #214 background image
4.3 Washing and Cleaning
HA-8190V 4-49
5 Complete column installation.
a Touch .
b When “Has the column been replaced?” appears,
touch .
The previous column counter value will be maintained.
Mechanical initialization will start.
When initialization is complete, the message “Fluid runs at the
same rate as during measurement.” will appear.
When fluid pumping is complete, the [Reagent replace menu]
screen will appear again.
c Touch to return to the standby screen.
Performing HbA1c calibration
Finish
REFERENCE:
The message “W-062 The front or maintenance cover is
open. appears if is touched with the front cover
opened. Be sure to close the front cover before touching
.
If is touched by mistake, the column counter will
be reset to “0000” and you will no longer know when to
replace the column.)
Cancel
Cancel
Cancel
OK
CancelHOME
NOTE:
Be sure to perform HbA1c calibration after washing the optical unit cell.
See “2.8. HbA1c Calibration” on page 2-38.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Arkray ADAMS A1c and is the answer not in the manual?

Arkray ADAMS A1c Specifications

General IconGeneral
BrandArkray
ModelADAMS A1c
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals