EasyManua.ls Logo

Bosch Rexroth Tightening System 350 - Page 558

Bosch Rexroth Tightening System 350
641 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
558/641 Bosch Rexroth AG | Tightening Technology 3 608 878 300
System 350 | 3 608 878 300/2019-03
Tool As of version V2.600 of the Rexroth Tightening System 350, the Tool option is supported. Via Tool, you
can configure the maintenance interval for tightening spindle and ErgoSpin and make settings for
ErgoSpin SlimLine/GripLine for a new angle head. Click the Options button to start the configuration.
The button is active if a measurement transducer DMC, VMC...-SD/-QC/-SP, 3WMC090 / 4WMC220
or ErgoSpin has been configured. The ErgoSpin hand-held nutrunner options/ DMC options/ VMC
options/ WMC options dialog is displayed:
Table 7–15: ErgoSpin hand-held nutrunner options/ DMC options/ VMC options/ WMC options dialog
Element Description
Info hand-held nutrunner
(for ErgoSpin) /
Info tightening spindle
(for DMC, VMC...-SD/-QC/-SP
and 3WMC090/ 4WMC220)
ID number: Number to identify the hand-held nutrunner or the tightening spindle.
Comment: For entry of a comment, a max. of 400 characters is available.
MCT protocol document ID: Here, you can save a comment for the MCT
protocol document identification.
Maintenance interval
monitoring
Options / settings: Opens the Maintenance settings dialog. In this dialog, at
least one of the following options Next maintenance after cycles and/or Next
maintenance by date can be selected to define performance of the next
maintenance:
Write protection: The checkbox can only be selected if your are logged in as
system administrator. If the write protection is active, users can only change
the values for the maintenance information.
Next maintenance after cycles:
Fixed with: User is free to determine after which number of tightening cycles
the maintenance is to be performed.
Load-dependent with:
The tightening cycles for the maintenance are automatically determined by
the system in a load-dependent manner.
Information:
Here, you can define the number of tightening cycles before the maintenance
information is to be provided.
Remaining tightening cycles: Here, the remaining tightening cycles until the
maintenance are displayed.
Next maintenance by date:
Maintenance on:
Here, the date for the next maintenance is set.
Information, upcoming maintenance:
Here, it can be defined when information on the upcoming maintenance is to
be provided.
Confirm maintenance: If you want to confirm the maintenance, you have to
activate the Confirm maintenance checkbox.
The settings are accepted by means of OK. You can exit the dialog without
changes using Cancel. To accept the settings made, the channel
configuration has to be sent to the controller.
The settings for the maintenance interval will be displayed above the button.
If in active monitoring/information, the limit set for the next maintenance/
information is reached, the controller will set the MntTool/InfoTool PLC output
signal and enter a class 5 system error. The PLC signal is reset if one of the
following events occurs:
Maintenance is deactivated.
The maintenance is confirmed and the settings are adjusted accordingly.
Exchanging the angle head
(only for ErgoSpin SlimeLine/
GripLine)
new serial number: Number of the next output drive to be used. By default, the
serial number of the last angle head exchanged is displayed.
Number of cycles: Cycles that have already been run by the angle head to be
used. By default, 0 is entered.
The settings are accepted by means of OK
. If no entries have been made, a
warning diagnosis with corresponding information will be shown when you try to
accept the settings.

Table of Contents

Related product manuals