EasyManua.ls Logo

CI Systems ControlMaster SR-800R - Assembling the System; Unpacking the Julabo Circulation System and Low-Temperature Blackbody; Figure 8-2: Low-Temperature Blackbody Packaging

CI Systems ControlMaster SR-800R
185 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CI Systems SR-800R
8.4 Assembling the System
The sequence in assembling the system is:
Unpacking the Julabo Circulation System and Low-Temperature Blackbody
(see Section 8.4.1)
Connecting Pipes and Dry Nitrogen to the Low-Temperature Blackbody
(see Section 8.4.2)
Connecting Pipes to the Julabo Circulation System (see Section 8.4.3)
Cable-Connection (see Section 8.4.4)
Operation Instructions (see Section 8.4.5)
8.4.1 Unpacking the Julabo Circulation System and Low-Temperature
Blackbody
1. Unpack the Julabo Circulation System and place it on site (refer to the Julabo
Circulation System Operating Manual).
2. Unpack the Blackbody and place it on site at a distance of up to 4 meters from the
Julabo Circulation System. A general view of the Blackbody packaging is shown
in Figure 8-2:
Figure 8-2: Low-Temperature Blackbody Packaging
Blackbody
Packaging
605-7040 Operation Manual
Rev D 8-6
June 2013
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Table of Contents