EasyManua.ls Logo

CI Systems ControlMaster SR-800R - Preventive;Scheduled Maintenance Tasks

CI Systems ControlMaster SR-800R
185 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CI Systems SR-800R
5.4 Preventive/Scheduled Maintenance Tasks
The SR-800R Preventive/Scheduled maintenance includes the following tasks:
Visual Inspection (see Section 5.4.1)
Cleaning (see Section 5.4.2)
Calibration Procedures (see Section 5.4.3)
5.4.1 Visual Inspection
1. Clean all SR-800R subassemblies using a soft cloth, soaked in authorized cleaning
material (IPA or similar).
2. Search for and tighten any loose part (screws, connectors, etc.).
3. Verify the tightening and proper connection of all cable connectors.
5.4.2 Cleaning
1. Wipe all SR-800R sub assemblies using a soft hairbrush.
2. Clean all SR-800R subassemblies using a soft cloth, soaked in authorized cleaning
material (IPA or similar).
5.4.3 Calibration Procedures
The Calibration Table of the SR-800R Blackbody family is stored in the blackbodies.
Therefore, only the sensor needs to be calibrated.
The sensor shall be periodically calibrated once a year.
605-7040 Operation Manual
Rev D 5-7
June 2013
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Table of Contents