EasyManua.ls Logo

Ecolab ULTRAX Compact - 7.7 Refitting the pumps

Ecolab ULTRAX Compact
568 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.7 Refitting the pumps
NOTICE!
In the case of long metering lines or back-pressures > 0.2 MPa (2.0 bar), it
is possible to exchange the factory-installedpumps for EMP III (54 l/h) pumps.
The pumps must be installed in pairs; equipment may not be mixed.
Illustration Description Material Item No. EBS no.
EMP III, 54 l/h
(2 units required)
PP/EPDM 149218 10024864
Pump connection set
15.9/22.3 G5/8i
(4 pcs required)
PP 201550 10026940
Pump bracket
for 2 x EMP III (54 l/h) pumps.
Attachment parts for pumps and
brackets enclosed.
(1 pc required)
PP 201702 10033157
Installation
59 MAN046590 Rev. 6-03.2022

Table of Contents

Related product manuals