Constellation™ November 2003
Index-10
R
rack
grounding 3-7, 3-11
rack installation
3-11
rack, location of equipment
2-1
rack-grounding cable
3-2
radiation hazard
1-3
radio communications interference
1-6
radio interface
1-20
radio rack, grounding
3-7, 3-11
REBOOT SYSTEM command
6-8
Configuration submenu B-10
rebooting software
9-11
received signal level
far-end Receiver 1-18
Receiver Assembly
1-8
front view 11-15
IF filter 11-19
installing 11-20
LED indicators 3-29, 8-11
LED indicators, location 11-15
LNC 11-16
locking traffic 11-19
log form 8-14
MCX connector 11-16
multiplier, location 11-16
removing 11-19
removing and installing multiplier-filter
11-16
test points, location 3-29, 8-11, 11-15
torque specification 3-29, 8-11, 11-15,
11-20
what to measure 8-14
record, transmitter measurements
3-1
records of Transmitter measurements
8-1
Redwood Shores address
12-9
reference frequency
measuring at the Receiver Assembly
3-9
measuring at the Transmitter Assembly
3-9
regulatory compliance
1-5
relay
external control 1-19
fuse alarm 3-19, A-6
outputs 3-19, A-6
specifications 3-19, A-5
RELEASE command
Standby M12 Unit 11-34, 11-35
remote download
9-2
removing
High Level Mux 11-26
M12 Unit 11-34
Modem 11-24
Power Supply 11-22
Service Channel 11-31
SPU Controller 11-33
Standby M12 Unit 11-34
Transmitter Assembly 11-12
removing for easier installation
3-15
repair
charges 12-5
fax number 12-8
telephone number 12-8
repair and return
12-5
repair service locations
12-8
repairing
equipment 12-1
other manufacturer’s equipment 12-11
repeater
protected 1-9, 1-12
rack-mounting configuration 1-8
Service Channel D-1
repeater configuration
add-drop 1-6, 1-9, 1-11
repeater system
5-5, 11-25, 11-27
front view 11-5
replacement of equipment
12-1
replacement of modules, simultaneous
10-3, 11-2
replacement unit
12-6
reporting damaged goods
2-2
residential area, operation in
1-6