3 Commissioning
3.5 Commissioning wizard 8400
56
Lenze · 8400 HighLine · Reference manual · DMS 12.0 EN · 06/2017 · TD23
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
How to carry out a guided commissioning using the »Engineer«:
1. Go to the Project view and select the 8400 HighLine inverter.
2. Going online.
After a connection to the inverter has been established, the following status is displayed in
the Status line:
3. Click the icon to open the commissioning wizard 8400 dialog box.
• Now the commissioning wizard guides you step by step through the setting of the
important parameters for a quick commissioning.
•The Next button can only be activated again after all parameter settings in the device
have been reset via the Load Lenze setting button.
Related topics:
Commissioning of the "Actuating drive speed" technology application
( 58)